Close Menu
Just post
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Content Transparency
    • Editorial Policy
    • Fact Checking Policy
    Facebook X (Twitter) Instagram
    Just post
    Subscribe
    • Home
    • News
    • National
    • International
    • politics
    • Tech News
    • Game
    • campus
    • Entertainment
    Just post
    Home»News»Barapukuria Thermal Power Plant Resumes Production
    News

    Barapukuria Thermal Power Plant Resumes Production

    DMN DeskBy DMN DeskApril 25, 2026 5:45 AMNo Comments1 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email


    0

    Production at Dinajpur’s Barapukuria Thermal Power Plant has resumed after a prolonged 48-hour shutdown caused by mechanical faults. The plant recommenced operation today, Friday (April 24).

    Last Wednesday (April 22), around 10 PM, Unit 1, with a production capacity of 125 megawatts, shut down. This halted production across all three units of the thermal power plant, leading to power outages in Dinajpur and 8 other northern districts.

    Prior to this incident, Unit 2, with a capacity of 125 megawatts, and Unit 3, with a capacity of 275 megawatts, of the same power plant had already been shut down for a long period.

    It is noteworthy that the coal-fired Barapukuria Thermal Power Plant was established next to the Barapukuria coal mine in Dinajpur in 2006, utilizing coal produced from the mine. Initially, two units, each with a production capacity of 125 megawatts, totaling 250 megawatts, were installed.

    Subsequently, in 2017, another unit with a 275-megawatt production capacity was launched, increasing the plant’s total capacity to 525 megawatts. However, due to mechanical faults and various other complexities, the power plant has never been able to produce electricity at its full 525-megawatt capacity simultaneously.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleIsraeli Strikes in Lebanon Kill 5, Including Journalist
    Next Article Two More Ships Arrive at Chattogram Port with Over 68,000 Tons of Diesel

    Related Posts

    Ad-din Hospital Gets License Back

    July 27, 2026 5:35 PM

    Final Date Announced for Publication of SSC and Equivalent Examination Results

    July 27, 2026 3:22 PM

    Government Committed to Building Modern, Technology-Driven Army: Prime Minister

    July 27, 2026 11:08 AM
    Latest News

    Ad-din Hospital Gets License Back

    July 27, 2026 5:35 PM

    Final Date Announced for Publication of SSC and Equivalent Examination Results

    July 27, 2026 3:22 PM

    Government Committed to Building Modern, Technology-Driven Army: Prime Minister

    July 27, 2026 11:08 AM

    Concern over Missile Stockpile, Trump Halts New Attack on Iran

    July 27, 2026 8:48 AM

    Prime Minister Inaugurates Army Headquarters Selection Board-2026

    July 27, 2026 6:10 AM

    Md. Sahabuddin Vacates Bangabhaban Two Days After Resignation

    July 27, 2026 4:09 AM
    ADS
    Facebook X (Twitter) Instagram YouTube
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.